Dubno Site # 3


Shybena mountain

Location of investment site Torhova street (the town suburb).

Dubno: Investment Site # 3

Investment Site # 3

Geographical location of investment site 50°25’38.0″N 25°42’32.6″E
Area of investment site An integral investment site with an area of 2.0 ha.
Land specification Flat, there is no solid surface. There is a possibility of spring water on the site.
Premises (buildings) on site if any There is no premise on the site (greenfield).
Ownership Communal.
Zoning outlined in master plan (priority usage of the territory) Residential and public buildings (low-rise residential and public buildings).
Technical infrastructure Electric power supply: the distance to the connection point is 150 m. Power line of ІІІ category with capacity of 300 kW; 150 kW transformer.

Water supply: municipal water network. The distance to the connection point is 200 m. Capacity is 30 m3/h.

Gas supply: municipal gas network of average pressure, the distance to gas network and gas distribution station is 400 m.

Sewage: not available (neither run-off water system).

Telecommunications infrastructure There is an access to telecommunication network and broadband Internet on a base of JSC “Ukrtelecom”; the distance to the distribution cabinet is 150 m.
Distance to the nearest residential area 40 m
Transport links to investment site The distances to:

  • national motor road: 0.1 km;
  • airport: 40 km;
  • railway track: 7.0 km.
Limits in territory development if any There are no environmental constraints.
Proximity to residential area.
Terms of investment site transfer in operation Auction sale of lease rights with a starting price of 10.66 UAH/m2 (as per calculation on 01.01.2015).
Estimated value of investment territory 13520.58 USD (at the rate of NBU as of 01.01.2015 – 15.768556 UAH/USD).